Engineering & fabrication
PEBs
The quotation is a tonnage. Get the take-off wrong at enquiry and the margin is gone before the first plate is cut.
Who uses it
- Estimation
- Design
- Production
- Erection
- Finance
What it runs
- Enquiry to estimateDrawings and specifications read, steel take-off built, tonnage priced.
- Design and drawingsDrawing register with revisions, approvals and which revision is on site.
- FabricationShop production against the bill of materials, with plate and section consumption booked.
- Dispatch and erectionWhat has shipped, what is at site, and what the erection crew is waiting on.
- Project costTonnage quoted against tonnage consumed, and the margin as it stands today.
What the agents do
- Builds the steel take-off from the enquiry drawings
- Prices the tonnage from your current rates and drafts the quotation
- Flags when a superseded drawing revision is still on the shop floor
- Tracks quoted tonnage against consumed and warns when the margin slips
Thirty minutes on the PEBs system