LetMeDoYourJob.ai
Engineering & fabrication

PEBs

The quotation is a tonnage. Get the take-off wrong at enquiry and the margin is gone before the first plate is cut.

Who uses it

  • Estimation
  • Design
  • Production
  • Erection
  • Finance

What it runs

  • Enquiry to estimateDrawings and specifications read, steel take-off built, tonnage priced.
  • Design and drawingsDrawing register with revisions, approvals and which revision is on site.
  • FabricationShop production against the bill of materials, with plate and section consumption booked.
  • Dispatch and erectionWhat has shipped, what is at site, and what the erection crew is waiting on.
  • Project costTonnage quoted against tonnage consumed, and the margin as it stands today.

What the agents do

  • Builds the steel take-off from the enquiry drawings
  • Prices the tonnage from your current rates and drafts the quotation
  • Flags when a superseded drawing revision is still on the shop floor
  • Tracks quoted tonnage against consumed and warns when the margin slips
Thirty minutes on the PEBs system